June 2019 Update

On Monday, June 10, Michael Ballard (myself), Harrison Scott, Dave Omieczynski, and Richard Valot had a meeting with representatives from the Angeles National Forest. They included Jerry Perez – Forest Supervisor, Justin Seastrand – Environmental Coordinator, Ricardo Lopez – Road Engineer, and Jamahl Butler – District Ranger. Our meeting, which was held on the Ridge Route near the southern end, was to discuss a range of topics regarding the road. We initially met at the Ridge Route and Templin Highway where we made introductions and briefly went over the meeting details. From there, I led the group with my sportbike up the road to the southern gate. At that point, we discussed the land ownership problems and the 2010 paving, which we believe will help us with our goal of getting the road reopened.

After our discussion, they opened the gate and I led the group on a tour of the Ridge Route from the southern gate to Reservoir Summit. The initial plan, however, was to only go about four miles north to see the recently reconstructed section of road. Each stop, the USFS people decided to go a bit further. We didn’t mind this at all! Along the way, we made stops at some of the sections of the roadway that had been repaired as well as some of the historic sites along the road, such as the National Forest Inn site. At each major stop, Scotty brought out his books and showed photos of the sites.

Section recently reconstructed about 4 miles north of the south gate. Looking northerly.
Looking southerly near the end of the reconstructed section.

Once we got to Reservoir Summit, we had another discussion regarding the state of the roadway. Overall, it was in very good shape with only a few areas needing more immediate attention. Many sections had been resurfaced and we did make it clear that we didn’t want to see a wholesale repaving of the roadway for the sake of preservation. They seemed to understand this. After our discussion and hike to the reservoir, we all headed back to the southern gate to finalize our meeting.

Just south of Reservoir Summit.

The meeting was productive and positive. There is still a lot of work to be done, but they were willing to help and to work with us. Instead of a Memorandum of Understanding, we may be entering into a Volunteer Agreement regarding cleaning drains and such along the roadway. They also stated they would do additional research regarding the land ownership issue at the southern end of the roadway. In regards to opening the roadway, there is still no estimate on when it will reopen. Another concern is roadway maintenance, which we may be able to help defray with volunteer effort. There are still additional issues that need to be addressed but we at least have a better understanding of what the Forest Service sees as the problems. One of them, overall condition of the roadway and ability for vehicles to travel safely, I tried to prove by using my sportbike. If I can go on the roadway using that vehicle, most everyone should be able to pass over it safely as well.

Only time will tell if this meeting was truly successful, but I believe it was. I will give additional updates when we hear back from the USFS in the near future.

Road Reports – 1/2/2019

Reports are coming in that the Ridge Route is undergoing construction work. It seems to be taking place about 4 miles north of the southern gate. The construction, thus far, has been patchwork as well as possibly new concrete. The work is being done by Granite Construction Company, which has done work on the road in the past. So far, we don’t know who initiated the work or who is paying for it. Assuming the work is being done to proper standards, set out by the Ridge Route being on the National Register of Historic Places, this is a good sign. As the Federal Government is presently shut down, getting information from them has been a bit difficult. As soon as we find out, we will post the information here.

Road Reports

While the RRPO is dedicated to preserving and protecting the Ridge Route, we don’t always have a chance to get onto the road. We strongly encourage you to send us reports as to road conditions along the route. I live in San Diego, another of our board members live in the Bakersfield area.

So, if you have traveled the road recently, send us a report of conditions. We want to know what you saw, what the road was like, and if the gates were open. Did you see any signs that were new? Perhaps there was some vandalism? Please let us know. We intend to include this information in our reports to the Forest Service to help us get this road open and in better repair.